Metering is ON
suntimes
 

Saturday, May 26, 2012

Metra says ‘we are sorry’ for Monday’s delays at Union Station

Updated: January 10, 2012 4:36PM



Metra is apologizing to riders a day after signal problems caused long delays and huge crowds at Union Station.

Metra — in a letter to riders of the BNSF, SouthWest Service and Heritage Corridor lines — said the problems stemmed from the failure of a signal circuit at a critical point where tracks intersect on the south end of Union Station, preventing most trains from entering or leaving.

The agency says attempts were made to inform riders of the situation using station announcements, e-alerts and its website. “But we know the situation was frustrating and some information was confusing, and we are sorry,” Metra said in the letter.

Amtrak, which owns Union Station and is responsible for maintaining its tracks and signals, started working on the problem shortly after it developed about 4:20 p.m. Monday, Metra said.

Signal problems can usually be fixed quickly and the transit agency said there was no reason to believe this situation would be any different. Instead, repairs took up to 42 minutes during an extremely busy period of the evening rush -- 4:45-6:30 p.m.

The delays prompted commuters to take to Twitter, complaining about “bad stuff going down at Union Station” and “hundreds of people standing around.”

Metra and BNSF are working with Amtrak in an effort to eliminate or at least limit the number of signal and switch issues at Union Station, and to ensure such problems are prevented in the future, the letter siad.

Latest News Videos
© 2012 Sun-Times Media, LLC. All rights reserved. This material may not be copied or distributed without permission. For more information about reprints and permissions, visit www.suntimesreprints.com. To order a reprint of this article, click here.

Comments  Click here to view or make a comment